START WITH THE SAME SCOPE

Two builders can receive the same drawings and make different assumptions. One includes site restoration; another leaves it to the owner. One prices a defined window package; another uses an allowance. Before comparing totals, establish the scope each proposal represents. Review the major work categories side by side and mark each as included, allowed, excluded, owner supplied, or unresolved. An empty cell is a question to answer.

02

EXAMINE THE ALLOWANCES

An allowance can be appropriate when a selection is still open. It needs a clear basis. Ask whether the figure covers material only or also delivery, installation, preparation, and related components. Then compare that basis with the level of finish and the quantities the design requires. A low allowance may reduce the proposal total while leaving the intended work unchanged. The owner still needs to understand the likely decision ahead.

03

FOLLOW THE RESPONSIBILITY

Owner-supplied items need coordination even when they sit outside the construction price. Someone must confirm the specification, place the order, inspect delivery, provide storage, and resolve damage or missing components. The installation trade may need the product information long before the item arrives. Ask where these responsibilities sit and whether the proposal allows for the coordination involved.

04

READ THE WORK AROUND IT

The finished item is only part of its installed scope. Flooring may need preparation and moisture evaluation. A large glazed opening may require structural coordination, installation access, flashing, and finishing work. Compare the surrounding work, not just the visible product. The same review should cover temporary protection, access, waste handling, and site restoration where they apply to the project.

05

ASK ABOUT THE ASSUMPTIONS

A proposal should make its starting conditions understandable. Which drawings and revisions were used? Which specifications are fixed? What remains subject to investigation? What selection dates or access arrangements does the plan assume? These questions help reveal why prices differ and where additional design or planning work would make the comparison more useful.

06

MAKE AN INFORMED COMPARISON

A lower price can reflect a more efficient approach or a genuinely competitive proposal. The purpose of bid review is to understand the difference. Once scope, quality, assumptions, and responsibilities are aligned, the owner can assess price alongside the builder’s planning, communication, and proposed execution. If the comparison is still unclear, that is useful evidence that the project needs more definition before a decision.

TAKE INTO YOUR NEXT CONVERSATION
  • Compare a defined scope before comparing totals.
  • Check what each allowance actually covers.
  • Assign responsibility for owner-supplied work and materials.
  • Use unresolved differences to guide the next planning work.